Go to top
Aviation
Structural Concrete Design

SR Technics, Construction of a Maintenance Repair & Overhaul (MRO) Facility

Luqa Airport, Luqa (Malta)

Through 2017, Forward Structures formed part of a competitive tender bid for the construction of an MRO facility, consisting of two large hangars, each on either side of a central annex building for administration, stores and workshop areas.

The project, spread over around 20,000m2 is set to commence around June 2018.

Forward Structures are responsible for all the civil works consisting of substructure works, construction of the external aprons as well as internal hangar floors, retaining walls and annex building.

  • Structural Engineers: Forward Structures (Civil scope) ASI (Steel Hangar Design)
  • Client: iAS