Dingli
Forward Structures was tasked with the design development and co-ordination with the foreign plant consultants to design, analyse and detail the construction of the civil works which form the backbone of the aggregate washing plant, consisting of a series of seismically resistant retaining walls and push walls, as well as the construction of a large underground cellular reservoir for the harvesting of rainwater for use in the process.
The plant was inaugurated on the 7th September 2020.