Project Management of Construction of 700 Ton Jetty

Maritime Hub, Marsa

Forward Structures were responsible for the project management of the construction of two jetties within the old Marsa Shipbuilding dock, to host a 300-ton and a 700-ton travel lift at the Mediterranean Maritime Hub, Marsa.

Under direction of Forward Structures and together with the contractor, Attard Bros, the project was delivered ahead of time within less than three months, enabling the client to flood the dock ahead of schedule.

  • Structural Engineers: EBD SOlutions
  • Project Management: Forward Structures